Drawings and site supervision
What I learned
- It was the first time I saw the installation of electrical pipe on a brick wall. The pipe was heated with a torch so it could change its shape.
2016
Task
Drawings and site supervision
What I learned
- It was the first time I saw the installation of electrical pipe on a brick wall. The pipe was heated with a torch so it could change its shape.
- The faces of the counters were granite slabs glued to a steel frame. While setting them the slab chipped on the corner and it was fixed with some glue and then polished. It was absolutely seamless.